The new case study “London Underground” is available. Learn more about the project:
- Track renovation for London underground
- Solution: Padded railway sleepers as protection against vibrations
Highlights:
- Reduction in sound transmission through tunnel walls,
- Elastic pads on bottoms and outsides of sleepers,
- Significant cost benefits through efficient preparatory work in sleeper works